INVENTOR's page on CORDIS site :
INVENTOR's public flyer [PDF for download] :
INVENTOR's Issued Deliverables
Issue Date | Number | Title | Public/Confidential |
| D3.4 | Report on noise impact from LG noise reduction via design-to-noise approach, validated through dedicated experiments | CO |
| D3.8 | Report on experimental (S2A) and numerical simulations of noise impact from passive porous flow through fairings implemented on the full-scale GB-MLG | CO |
| D5.1 | Experimental assessment (NWB/DNW) and numerical simulation of noise reduction at component and overall airframe levels for the Short Medium Range Aircraft Platform | CO |
| D5.4 | Global assessment of airframe noise reduction on Short Medium Range Aircraft Platform and application to certification conditions | CO |
| D6.6 | Innovative Technology Roadmap | PU |
13/12/2024 | D4.6 | Synthesis and selection of the best low-noise HLD configuration and best noise reduction technologies to be tested in NWB and assessed on virtual aircraft platforms in WP5 | CO |
13/12/2024 | D6.7 | Update of the PEDR and results | CO |
02/12/2024 | D4.3 | Comparison of baseline/optimized Krueger flap and conventional slat generated leading edge noise | PU |
29/11/2024 | D5.2 | Experimental assessment (NWB/DNW) of noise reduction at component and overall airframe levels for the Business Jet aircraft platform | CO |
29/11/2024 | D5.3 | Global assessment of airframe noise reduction on Business Jet Aircraft Platform and application to certification conditions | CO |
27/11/2024 | D6.8 | Final Dissemination and Exploitation Workshop Minutes | PU |
15/11/2024 | D1.7 | Final Meeting Minutes | CO |
17/10/2024 | D3.3 | Report on numerical simulation of noise reduction of LG wake/flap interaction, validated through dedicated experiments | CO |
08/10/2024 | D3.1 | Report on noise impact from active technologies (fluidic actuators/air curtain) numerical simulations validated through dedicated experiments | PU |
08/10/2024 | D3.5 | Synthesis and selection of the best low-noise LG configuration and best noise reduction technologies to be tested in NWB and assessed on virtual aircraft platforms in WP5 | CO |
23/09/2024 | D4.4 | Report on the aerodynamic and acoustic assessment of low noise slats and slat tracks in the F2 wind tunnel | PU |
19/09/2024 | D4.5 | Numerical investigation of spoiler noise generation and mitigation | PU |
30/07/2024 | D2.10 | Report on specifications of Short Medium Range Aircraft Platform and certification assessment in WP5 | CO |
15/07/2024 | D3.9 | Report on numerical simulations of passive porous flow through fairings implemented on the LAGOON landing gear, validated through dedicated experiments in A-Tunnel/TCD | CO |
19/04/2024 | D2.9 | Report on specifications of Business Jet Aircraft Platform and certification assessment in WP5 | CO |
17/11/2023 | D2.8 | Report on specifications for representative and full-scale experimental (S2A WT) and numerical studies on add-ons for full-scale LGs in WP3 | CO |
17/11/2023 | D2.14 | Report on specifications for representative and reduced-scale experimental (AWB/DLR) and numerical studies on the reduction of the GC-MLG / flap interaction noise in WP3 | CO |
17/11/2023 | D3.6 | Report on the experimental noise impact of passive porous flow through fairings implemented on the LAGOON landing gear in ATunnel/TUD | CO |
26/09/2023 | D3.2 | Report on the experimental characterization of passive porous flow through fairings samples in WAABLIEF/VKI and B2A/ONERA | CO |
26/09/2023 | D3.7 | Report on experimental (AWB/DLR) and numerical simulations of noise impact from passive porous flow through fairings implemented on the small-scale GB-MLG | CO |
21/07/2023 | D2.12 | Report on specifications for representative and reduced-scale experimental (AWB/DLR) and numerical studies on active blowing (air curtain) for the reduction of the GB-MLG noise in WP3 | CO |
21/07/2023 | D2.13 | Report on specifications for representative and reduced-scale experimental (AWB/DLR) and numerical studies on an optimised LG via the design-to-noise process for the reduction of the GC-MLG noise in WP3 | CO |
20/06/2023 | D2.6 | Report on specifications for representative and reduced-scale experimental (AWB/DLR) and numerical studies on passive porous flow through fairings for the reduction of the GB-MLG noise in WP3 | CO |
20/06/2023 | D2.11 | Report on specifications for representative and reduced-scale experimental (AWB/DLR) and numerical studies on active blowing (air curtain) for the reduction of the LAGOON LG noise in WP3 | CO |
22/12/2022 | D4.1 | Parametric study on slat noise reduction and selection of best NRTs based on porous treatments | PU |
29/09/2022 | D4.2 | Parametric study on slat track noise generation and mitigation and selection of best low-noise slat track designs | PU |
27/09/2022 | D1.6 | TRM-PMM 3 Minutes | CO |
21/09/2022 | D1.5 | TRM-PMM 2 Minutes | CO |
01/04/2022 | D2.7 | Report on specifications for experimental (F2/ONERA) and numerical studies on slat track noise in WP4 | CO |
15/03/2022 | D7.1 | POPD - Requirement No. 1 | CO |
14/01/2022 | D2.4 | Report on specifications for experimental (AWT/UoS) and numerical studies on spoiler noise in WP4 | CO |
17/12/2021 | D6.5 | Finalised website | PU |
22/10/2021 | D2.5 | Report on specifications for experimental (AAWT/UoB) and numerical studies on porous slat noise in WP4 | PU |
22/10/2021 | D6.4 | Data Management Plan | CO |
14/09/2021 | D1.4 | TRM-PMM 1 Minutes | CO |
14/09/2021 | D2.2 | Report on specifications on flow through fairings and surface materials to be characterised in WAABLIEF/VKI, B2A/ONERA and A-Tunnel/TUD for WP3 and WP4 | CO |
27/08/2021 | D2.3 | Report on specifications for preliminary experimental (AWT/NLR) and numerical studies on slat track noise in WP4 | CO |
24/06/2021 | D2.1 | Report on specifications on acoustic reduction objectives | CO |
11/03/2021 | D6.3 | PEDR | CO |
05/03/2021 | D1.3 | Quality Assurance Plan and Risk Register | CO |
04/03/2021 | D6.2 | Project identity materials and communication plan | CO |
18/02/2021 | D1.8 | Protection of personnal data | CO |
22/12/2020 | D6.1 | Basic structure of the project website | PU |
27/07/2020 | D1.1 | Kick-off Meeting Minutes | CO |
27/07/2020 | D1.2 | Project management plan | CO |